Plans for a patient centered facility breaking ground in the Fall of 2006.
Building Hope Video (18 Mb)
Click to download if there are any issues with the video above.
Also available is a download of the (5 Mb) WMV Video, for those with lower bandwidth (press stop on video above for this). The video is 3 minutes long.